Scroll

Revitalization of the Náprstek Museum

Location Praha, Horní Počernice
Project phase Project for building permit
Year 2021
Program New construction of the central depository in Horní Počernice
Built-up area 3000 m2

The design of the new central depository is based on the investment plan (2013), the feasibility study (2016) and subsequent refinements and consultations with the client. The area designated for the construction of the Central Depository is located on the southeastern part of the NM site, with respect to the adjacent functional forest area, in close proximity to the entrance to the site. The proposed building consists of two rectangular masses, the administration mass and the depository mass.The proposed building consists of two longitudinal masses, the administration and the depository mass, with one slightly protruding in front of the other. At the interface of these masses, from the 2nd floor onwards, there is an atrium which provides light to the internal layout of the building. The built-up area is 3073 m2, the built-up area is 49 294,30 m3.

We are happy to help you with your project

+420 737 58 28 00